Railway Ministry forms inquiry committee after CRS raises concerns over Pamban Bridge

28 Nov, 2024 9:56 PM
Pamban Bridge
New Delhi, Nov 28 (IANS) The Railway Ministry has formed a five-member committee to investigate the concerns raised by the Commissioner of Railway Safety (CRS) regarding the Pamban Bridge, an iconic structure connecting Rameswaram (Tamil Nadu) and the mainland. The committee will submit its report within the next month and a half.

The Pamban Bridge, spanning 2.05 km and featuring a 72-meter vertical lift span, is a unique steel bridge in India. Designed by the international consultancy TYPSA, the bridge is a standout example of modern engineering, blending European and Indian design codes.

It was subjected to thorough proof-checking by IIT Chennai to ensure its compliance with safety and structural standards.

However, following the CRS' objections, the Railway Ministry has decided to address the concerns raised in a letter regarding the bridge's design and execution. The CRS pointed out three main issues with the project:

The planning of the bridge was deemed incorrect, as the standard design from the Research Designs and Standards Organisation (RDSO) was not implemented.

The specifications followed were not based on RDSO's standards but were instead international specifications.

The execution of the project did not involve RDSO in the process.

In response to these concerns, the Railway Ministry has set up a committee to probe the matter. The committee's task is to investigate these issues in detail and provide a comprehensive report. The committee will specifically examine the design approval process, the role of international consultants, and the involvement of RDSO in the project execution.

It is worth noting that despite the CRS' concerns, the Pamban Bridge's design had undergone double proof-checking - first by IIT Chennai and later by IIT Mumbai—ensuring the structural integrity and safety of the bridge.

The Southern Railway approved the final design after these rigorous checks, and the bridge's construction proceeded based on the design certified by two of India’s premier institutions and an internationally recognised consultant.

The approach girders were designed in accordance with local conditions, with modifications reviewed by IIT Madras and IIT Bombay. These revisions were also approved by the Southern Railway to ensure the bridge's compatibility with regional challenges.



Disclaimer   The information contained in this website is for general information purposes only. The information is provided by geo24news.com and while we endeavour to keep the information up to date and correct, we make no representations or warranties of any kind, express or implied, about the completeness, accuracy, reliability, suitability or availability with respect to the website or the information, products, services, or related graphics contained on the website for any purpose. Any reliance you place on such information is therefore strictly at your own risk.

In no event will we be liable for any loss or damage including without limitation, indirect or consequential loss or damage, or any loss or damage whatsoever arising from loss of data or profits arising out of, or in connection with, the use of this website.

We have no control over the nature, content and availability of those sites. The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.

If you are not willing to accept this disclaimer then we recommend reading news post in its original language.





 

 

Scroll to Top